组合式空调机组性能特点
Instruction of performance and characteristics
阶梯式不锈钢集水盘 Step stainless steel catchment pan
牢固的框架结构 Firm frame configuration
可靠的运转部件 Reliable running parts
专业软件设计 Special software design
专业净化机组 Special decontamination unit
优异热绝缘性能 Excellent heat insulating performance
先进的密封结构 Advanced sealing structure
组合式空调机组参数表
The Parameter List for Combination Air-conditioning Unit
型号ZKS–
ModelZKS–
|
风量
Amount of blast
|
冷量Refrigerating capacity( kw)
|
四排4 pipes
|
六排6 pipes
|
八排8 pipes
|
回风
Return air
|
新风
Fresh air
|
回风
Return air
|
新风
Fresh air
|
回风
Return air
|
新风
Fresh air
|
m3/h
|
kw
|
kw
|
kw
|
kw
|
kw
|
kw
|
04
|
4000
|
22.7
|
50.1
|
29.6
|
64.4
|
33.5
|
77.1
|
08
|
8000
|
48.3
|
106.4
|
61.2
|
130.7
|
70.4
|
147.5
|
10
|
10000
|
60.3
|
135.3
|
76.5
|
159.7
|
88.0
|
186.3
|
15
|
15000
|
93.5
|
205.5
|
117.0
|
241.5
|
133.0
|
282.0
|
20
|
20000
|
120.7
|
266.0
|
158.7
|
336.7
|
184.0
|
385.3
|
30
|
30000
|
189.0
|
406.0
|
238.0
|
483.0
|
266.0
|
564.0
|
40
|
40000
|
249.3
|
541.3
|
306.0
|
644.0
|
354.7
|
752.0
|
50
|
50000
|
311.7
|
676.7
|
382.5
|
805.0
|
440.0
|
940.0
|
60
|
60000
|
374.0
|
822.0
|
459.0
|
966.0
|
532.0
|
1128.0
|
型号ZKS–
ModelZKS–
|
风量
Amount of blast
|
冷量Refrigerating capacity( kw)
|
四排4 pipes
|
六排6 pipes
|
八排8 pipes
|
回风
Return air
|
新风
Fresh air
|
回风
Return air
|
新风
Fresh air
|
回风
Return air
|
新风
Fresh air
|
m3/h
|
kw
|
kw
|
kw
|
kw
|
kw
|
kw
|
70
|
70000
|
441.0
|
959.0
|
546.0
|
1143.0
|
620.7
|
1337.0
|
80
|
80000
|
504.0
|
1096.0
|
624.0
|
1306.7
|
709.3
|
1528.0
|
90
|
90000
|
549.0
|
1167.0
|
702.0
|
1407.0
|
780.0
|
1641.0
|
100
|
100000
|
610.0
|
1296.7
|
780.0
|
1563.3
|
873.3
|
1823.3
|
120
|
120000
|
748.0
|
1624.0
|
918.0
|
1916.0
|
1056.0
|
2236.0
|
140
|
140000
|
872.0
|
1894.7
|
1071.0
|
2254.0
|
1232.0
|
2608.7
|
160
|
160000
|
1008.0
|
2192.0
|
1248.0
|
2613.3
|
1418.7
|
3008.0
|
180
|
180000
|
1122.0
|
2466.0
|
1377.0
|
2898.0
|
1596.0
|
3384.0
|
200
|
200000
|
1246.7
|
2740.0
|
1530.0
|
3220.0
|
1773.3
|
3760.
|
注:
供冷工况:供水温度为7℃;
回风工况:进风干球温度27℃,湿球温度19.5℃;
新风工况:进风干球温度35℃,湿球温度28℃;
Remarks:
The working order for cold supply: The temperature of water supply is 7℃;
The working order for return air:
The dry/wet ball temperature of the coming into air is 27℃/19.5℃;
The working order for fresh air:
The dry/wet ball temperature of the coming into air is 35℃/28℃.
|